This article summarizes how the heat index levels of a construction-site microclimate station drive the indicator light, automatic sprinklers and voice announcements. For how to read the heat index chart and the risk levels, see the dedicated article "Heat Index: Temperature-Humidity Chart and Heat Hazard Risk Levels"; for the detection thresholds, see "Microclimate Stations and Hazardous Gas Detection Thresholds". For the equipment composition and linkage flow, seeHeat Hazard Linkage Solution。
Linkage Rules Overview
| Indicator Light | Heat Hazard Level | Trigger Condition (Heat Index °C) | Automatic Sprinklers 11:00–14:00 | Other Hours | Voice Announcement Frequency |
|---|---|---|---|---|---|
| Off | Level 1 | 26.7 and above, below 32.2 | Light off; automatic sprinkler linkage and voice announcements are not activated (only the basic heat hazard prevention measures apply) | ||
| Green | Level 2 | 32.2 and above, below 40.6 | Intermittent: spray 5 minutes, pause 10 minutes | Manual start, stops automatically after running 20 minutes | Triggered when the light turns on, then once every hour |
| Yellow | Level 3 | 40.6 and above, below 54.4 | Intermittent: spray 10 minutes, pause 10 minutes | Triggered when the light turns on, then once every hour | |
| Red | Level 4 | 54.4 and above | Intermittent: spray 10 minutes, pause 5 minutes | Triggered immediately when the light turns on (with warning sound), then once every 30 minutes | |
Voice announcements run 8:00–11:30 and 13:30–17:00.
Level 1: light off
A heat index of 26.7 or above and below 32.2 is Level 1. At this level the light is off and neither automatic sprinkler linkage nor voice announcements are triggered; linkage starts from Level 2 (green light). For the basic protection and precautions at Level 1, see "Heat Index: Temperature-Humidity Chart and Heat Hazard Risk Levels"。
Automatic Sprinklers
- 11:00–14:00 (strongest sunlight): runs intermittently by level; the higher the level, the larger the share of spray time.
- Other hours: manual start; stops automatically after running 20 minutes.
- Humidity priority: pauses when relative humidity is above 70%, regardless of level.
| Light / Level | Spray | Pause | Cycle | Spray Share |
|---|---|---|---|---|
| Green Level 2 | 5 minutes | 10 minutes | 15 minutes | about 33% |
| Yellow Level 3 | 10 minutes | 10 minutes | 20 minutes | 50% |
| Red Level 4 | 10 minutes | 5 minutes | 15 minutes | about 67% |
Voice Announcement Content
Green Level 2
"Thank you for your hard work, everyone. The heat index has reached Level 2. Please drink water regularly, replenish fluids every 15 to 20 minutes, and watch how you feel."
Yellow Level 3
"Attention! The heat index has reached the Level 3 warning. Please keep drinking water regularly; we recommend replenishing fluids every 15 to 20 minutes. If you feel hot or unwell, be sure to go to the rest area, turn on the mist cooling and take a break, and notify the on-site supervisor. Safety first."
Red Level 4
"(Alarm sound) Warning! The heat index has reached the red danger level. Supervisors of each area, please adjust working hours according to the situation. Colleagues working outdoors, please increase rotation frequency, and arrange at least 20 minutes of rest per hour for heavy physical work. Please drink plenty of water and use the rest area to cool down. If you feel unwell, stop work immediately. Safety first!"
This article is a general summary of the system linkage settings and does not constitute a legal interpretation. Actual parameters (time periods, spray and pause times, announcement content) should be adjusted according to the construction contract specifications and the latest announcements of the competent authority. Compiled: October 2026.